Difference between revisions of "Annual guillotine checks"

From SSS Wiki
Jump to navigationJump to search
Line 10: Line 10:
 
     Remove guillotine actuating pivot bolt
 
     Remove guillotine actuating pivot bolt
 
     Remove four bolts securing cable guide
 
     Remove four bolts securing cable guide
−
     Remove remaining four bolts securing guillotine blade retaining slides
+
     Remove remaining four bolts securing guillotine blade retaining slides
 
     Carefully withdraw moving blade and coaxial spring assembly - take care with compressed springs
 
     Carefully withdraw moving blade and coaxial spring assembly - take care with compressed springs
 
     Clean all detritus from mechanism and springs
 
     Clean all detritus from mechanism and springs

Revision as of 14:56, 1 April 2013

To ensure continuous reliability, it is strongly recommended that the following procedure should be carried out at each annual guillotine check:

   Cut cable with bolt cutters and withdraw through paying on gear
   Hands clear!
   Operate guillotine
   Check clearance between closed guillotine blades (should be < 0.005" or 0.013 mm). (Blade clearance may be adjusted by re-shimming.)
   Support paying on gear and remove six nuts and bolts
   Remove paying in gear
   Remove assister springs
   Remove guillotine actuating pivot bolt
   Remove four bolts securing cable guide
   Remove remaining four bolts securing guillotine blade retaining slides
   Carefully withdraw moving blade and coaxial spring assembly - take care with compressed springs
   Clean all detritus from mechanism and springs
   Clean and inspect all metal surfaces
   Check guillotine blades for damage and repair/replace if necessary
   Lubricate springs and sliding surfaces with lithium based grease
   Replace everything but the paying in gear in reverse order. (The moving blade is replaced in a similar way to that used to load the guillotine)
   Load guillotine
   Thread two pieces of cable through the guillotine assembly
   Hands clear!
   Fire guillotine - should cut two wires cleanly
   If OK - replace paying in gear and sign off
   If not call AA 


Equipment required:

Feeler gauges

Metric socket set and spanners

Releasing oil and small scraper/rags to clean mechanism and slides

Lub grease

Guillotine setting lever and pivot board.